HYDROCRACKING UNIT – LA

50K BPSD Hydrocracking Unit

SC Shell licensed technology
Overall Construction Management Responsibilities
Direct hire Mechanical construction execution
Developed scheme to offload reactors that shortened construction schedule
Over 250,000 detailed design and engineering man-hours
1,200,000 construction man-hours

Includes HCU, Light Ends Unit (LEU), Sour Water Stripper (SWS), Amine Treating Unit (ATU) and associated Offsites (OSBL)

HCU included 33 piperack modules (super modules)
LEU contained 9 piperack modules (super modules)
SWS, ARU and cooling Tower Units all stick built
  • Total RIG man-hours: approximately 1,450,000